Resources
29.01.2026 – publication
Distributed and Reconfigurable Communication System for Open Source Real-Time Simulations of Power Systems
By Pitz, Manuel
Hardware for real-time simulations of power systems is often highly specialized, proprietary, inflexible, and expensive. A consequence is that many systems have low interoperability, are not conducive to innovation, are...
31.03.2025 – publication
Data Management Plan (v1) / D8.3
By Guironnet, Adrien
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft. The DMP outlines how a research project handles data throughout its...
31.01.2026 – publication
Demonstrators preparation / D5.1
By Krommydas, Konstantinos
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft. This document outlines the technical planning for the execution of the WP5...
30.03.2026 – publication
Secure and scalable data-driven infrastructure allowing flexible coordination with other systems / D4.2
By Tun, Su Mon
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This deliverable describes a cybersecurity framework developed for modern distribution and transmission...
11.01.2026 – publication
Protocols & data interoperability framework / D4.1
By Simon, Sarah
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft Overall, this work provides a structured and extensible foundation for protocol and...
01.06.2026 – publication
Stability Management in Hybrid AC/DC Power Systems / D2.3
By Prada Hurtado, Anibal Antonio
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This deliverable provides the software code and technical documentation of the real-time...
30.04.2026 – publication
Real-time Optimal Operation of Hybrid AC/DC Power Systems / D2.2
By Haugdal, Hallvar
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This deliverable reports on the algorithms developed in Task 2.2 in InterSCADA,...
31.03.2026 – publication
Situational awareness in hybrid AC/ DC power systems / D2.1
By Cazal, Cesar
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This deliverable specifies the measurement data, algorithmic building blocks, and microservice-ready interfaces...
02.02.2026 – publication
Regulatory and standardization framework analysis / D1.2
By Ramos Perez, Leonard Enrique
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This document presents the outcomes from the activities performed in Interoperable, Scalable...
07.09.2026 – publication
Optimized Operation of Power Systems with Consideration of Stability Aspects
By Aliyari, Mohammad
Increasing electrification and remote renewable integration force power systems to operate near operational limits, of ten necessitating redispatch. However, high loading can compromise voltage stability even when static constraints are met....
22.06.2026 – publication
Influence of renewable resources on the inertia of electrical power systems and its influence on frequency protection schemes
By Prada Hurtado, Anibal Antonio
In this article, a comprehensive analysis of the impact of renewable generation on the power system inertia is performed. For this study, the authors implement an ambient measurements-based inertia estimation...
13.10.2025 – publication
Last Will Letter: A Secure Federated P2P Scheme for Blockchain-Oriented Virtual Redundancy and Backup
By Cazal, César Andrés
This work extends previous research on blockchain-based Virtual Redundancy, proposing a new approach to improve the reliability of distributed systems, with a focus on power grid applications. The original solution...
01.10.2025 – publication
InterSCADA demo specification / D1.3
By D'Arco, Salvatore
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft. This deliverable provides a full set of specifications for the four InterSCADA...
30.06.2025 – publication
System Operator Needs and Requirements for Future SCADA Systems / D1.1
By Couto, Mário
*This deliverable has not yet been officially approved by the European Commission and should be considered a draft.
22.07.2025 –
InterSCADA's logo
By ICONS Innovation Strategies
Main logo of the InterSCADA project. Available for download.
26.05.2025 –
InterSCADA presentation video
By Fondazione ICONS
Project presentation video, part of the communication kit.
09.05.2025 –
InterSCADA slide deck
By Danovi, Costanza
Slide deck presentation of the InterSCADA project. Pdf version.
15.04.2025 – image
InterSCADA roll-up poster
By Fondazione ICONS
80x200 InterSCADA roll-up poster.
15.04.2025 – image
InterSCADA leaflet
By Fondazione ICONS
Digital version of the InterSCADA project leaflet.
07.11.2024 – publication
New project set to develop modular SCADA platform to ensure power grids stability
By Fondazione ICONS
InterSCADA project launch press release.