Resources

29.01.2026 – publication

Distributed and Reconfigurable Communication System for Open Source Real-Time Simulations of Power Systems

By Pitz, Manuel

Hardware for real-time simulations of power systems is often highly specialized, proprietary, inflexible, and expensive. A consequence is that many systems have low interoperability, are not conducive to innovation, are...

31.03.2025 – publication

Data Management Plan (v1) / D8.3

By Guironnet, Adrien

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft.   The DMP outlines how a research project handles data throughout its...

31.01.2026 – publication

Demonstrators preparation / D5.1

By Krommydas, Konstantinos

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft. This document outlines the technical planning for the execution of the WP5...

30.03.2026 – publication

Secure and scalable data-driven infrastructure allowing flexible coordination with other systems / D4.2

By Tun, Su Mon

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This deliverable describes a cybersecurity framework developed for modern distribution and transmission...

11.01.2026 – publication

Protocols & data interoperability framework / D4.1

By Simon, Sarah

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft Overall, this work provides a structured and extensible foundation for protocol and...

01.06.2026 – publication

Stability Management in Hybrid AC/DC Power Systems / D2.3

By Prada Hurtado, Anibal Antonio

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This deliverable provides the software code and technical documentation of the real-time...

30.04.2026 – publication

Real-time Optimal Operation of Hybrid AC/DC Power Systems / D2.2

By Haugdal, Hallvar

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This deliverable reports on the algorithms developed in Task 2.2 in InterSCADA,...

31.03.2026 – publication

Situational awareness in hybrid AC/ DC power systems / D2.1

By Cazal, Cesar

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This deliverable specifies the measurement data, algorithmic building blocks, and microservice-ready interfaces...

02.02.2026 – publication

Regulatory and standardization framework analysis / D1.2

By Ramos Perez, Leonard Enrique

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft This document presents the outcomes from the activities performed in Interoperable, Scalable...

07.09.2026 – publication

Optimized Operation of Power Systems with Consideration of Stability Aspects

By Aliyari, Mohammad

Increasing electrification and remote renewable integration force power systems to operate near operational limits, of ten necessitating redispatch. However, high loading can compromise voltage stability even when static constraints are met....

22.06.2026 – publication

Influence of renewable resources on the inertia of electrical power systems and its influence on frequency protection schemes

By Prada Hurtado, Anibal Antonio

In this article, a comprehensive analysis of the impact of renewable generation on the power system inertia is performed. For this study, the authors implement an ambient measurements-based inertia estimation...

13.10.2025 – publication

Last Will Letter: A Secure Federated P2P Scheme for Blockchain-Oriented Virtual Redundancy and Backup

By Cazal, César Andrés

This work extends previous research on blockchain-based Virtual Redundancy, proposing a new approach to improve the reliability of distributed systems, with a focus on power grid applications. The original solution...

01.10.2025 – publication

InterSCADA demo specification / D1.3

By D'Arco, Salvatore

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft.  This deliverable provides a full set of specifications for the four InterSCADA...

30.06.2025 – publication

System Operator Needs and Requirements for Future SCADA Systems / D1.1

By Couto, Mário

*This deliverable has not yet been officially approved by the European Commission and should be considered a draft. 

22.07.2025 –

InterSCADA's logo

By ICONS Innovation Strategies

Main logo of the InterSCADA project. Available for download.

26.05.2025 –

InterSCADA presentation video

By Fondazione ICONS

Project presentation video, part of the communication kit.

09.05.2025 –

InterSCADA slide deck

By Danovi, Costanza

Slide deck presentation of the InterSCADA project. Pdf version. 

15.04.2025 – image

InterSCADA roll-up poster

By Fondazione ICONS

80x200 InterSCADA roll-up poster. 

15.04.2025 – image

InterSCADA leaflet

By Fondazione ICONS

Digital version of the InterSCADA project leaflet. 

07.11.2024 – publication

New project set to develop modular SCADA platform to ensure power grids stability

By Fondazione ICONS

InterSCADA project launch press release.